Cell: +254 733 213 982, +254 705 264 065

BARCLAYS BANK OF KENYA – NEW HEAD QUARTER WAIYAKI WAY

Electrical installations involving lighting and small power, cable management, Main Switchboard, Generator installation. Clean power PDU Switchboard and wiring of dual power to the server cabinets. Installation of 400 KVA Stabilizer. Testing and commissioning of the installation.

Architect: Triad Architects.
M&E: Geomax Consulting Engineers.

View Project Photos

SOME OF OUR CLIENTS

  • 1.png
  • 2.png
  • 3.png